Sunday, January 16, 2011

642-813 SWITCH exam topics

I think it makes sense to put all of our cards on the table and list all of the topics covered in the exam. A post covering each ambiguous Cisco topic should do the trick - does that sound good to y'all?

Implement VLAN based solution, given a network design and a set of requirements
- Determine network resources needed for implementing a VLAN based solution on a network
- Create a VLAN based implementation plan
- Create a VLAN based verification plan
- Configure switch-to-switch connectivity for the VLAN based solution
- Configure loop prevention for the VLAN based solution
- Configure Access Ports for the VLAN based solution
- Verify the VLAN based solution was implemented properly using show and debug commands
- Document results of VLAN implementation and verification



Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
- Determine network resources needed for implementing a Security solution
- Create a implementation plan for the Security solution
- Create a verification plan for the Security solution
- Configure port security features
- Configure general switch security features
- Configure private VLANs Configure VACL and PACL
- Verify the Security based solution was implemented properly using show and debug commands
- Document results of Security implementation and verification

Implement Switch based Layer 3 services, given a network design and a set of requirements

- Determine network resources needed for implementing a Switch based Layer 3 solution
- Create an implementation plan for the Switch based Layer 3 solution
- Create a verification plan for the Switch based Layer 3 solution
- Configure routing interfaces Configure Layer 3 Security
- Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
- Document results of Switch based Layer 3 implementation and verification

Prepare infrastructure to support advanced services

- Implement a Wireless Extension of a Layer 2 solution
- Implement a VoIP support solution
- Implement video support solution

Implement High Availability, given a network design and a set of requirements

-Determine network resources needed for implementing High Availability on a network
- Create a High Availability implementation plan
- Create a High Availability verification plan
- Implement first hop redundancy protocols
- Implement switch supervisor redundancy
- Verify High Availability solution was implemented properly using show and debug commands
- Document results of High Availability implementation and verification

No comments:

Post a Comment